Home Additions
All ServicesMore space, seamlessly added

Home Additions in Raleigh, NC

From sunrooms and second-story additions to in-law suites and expanded kitchens, we design and build additions that blend seamlessly with your existing home. Every addition starts with a structural assessment and ends with a space that feels like it was always there.

Gallery

Additions gallery

Photos marked “Inspiration” are design references. Ask us about bringing your project to life.

BF Remodeling projects

What We Do

What goes into a additions project

Room Additions

Bedrooms, family rooms, and sunrooms that match your home's architecture — from foundation to roofline.

Second-Story Additions

Add a full second story to expand your living space without losing your lot footprint. We handle engineering, framing, and all systems.

In-Law Suites & ADUs

Self-contained living spaces for multi-generational living — with kitchenettes, full baths, and private entrances.

Kitchen & Bath Expansions

Bump out your kitchen or master bath for the space you need — with matching floors, ceilings, and exterior finishes.

Garage Conversions

Transform an underused garage into a functional living space — insulated, drywalled, and finished to match the rest of the home.

Foundation & Roof Tie-Ins

Proper foundation work, roof tie-ins, and waterproofing so the addition is structurally sound and weather-tight.

How It Works

From first call to final reveal

1

Feasibility & Design

We assess your lot, zoning, and structure, then design an addition that meets your needs and blends with your home.

2

Permitting

We handle all permits and plans — including structural engineering, zoning review, and HOA approval if needed.

3

Foundation & Framing

Foundation, framing, roof tie-in, and rough-in of electrical, plumbing, and HVAC — all inspected and to code.

4

Finish & Blend

Drywall, flooring, trim, and exterior finishes that make the addition look original to the home.

Questions

Frequently asked

A room addition typically takes 8–16 weeks depending on size, complexity, and weather. Second-story additions can take longer due to structural work.

Yes, always. We handle all permits, engineering, and inspections as part of your project — you do not deal with the city.

Yes. We source matching siding, brick, roofing, and trim so the addition blends with your home's original exterior.

We check zoning and setbacks during the feasibility phase. If your lot cannot accommodate the addition you want, we tell you before you spend money on design.

Still have questions? We're happy to talk it through — no obligation.

Get your free estimate

Ready to start your additions project?

Get a free, no-obligation estimate from a local, family-owned team. We respond within 1–2 business days, often sooner.

Serving Raleigh, Durham, Cary & the Greater Triangle